JYSK DCB
Our scope
Altenova delivered a comprehensive fire protection package covering:
- sprinkler system,
- sprinkler monitoring syste,
- fire alarm and detection, including aspirating smoke detection,
- internal and external hydrant system,
- kitchen fire protection.
The installation spans approximately 87,250 m², incorporating around 148.4 km of piping weighing 685 tonnes and 91,500 sprinkler heads. The detection systems include 1,683 detectors and 322 aspirating smoke detectors, reflecting the scale and technical demands of the project.
Engineered for demanding environments
Protecting fully automated high-bay warehouses requires fire protection systems designed around the facility's specific layout, storage configuration and operational requirements. The project combines multiple fire protection technologies within a single scope, with design and implementation aligned with VdS requirements and applicable EU and national standards and regulations. This comprehensive approach supports reliable fire detection, effective fire suppression and protection across the warehouse environment.