Westfield
Sprinkler systems

Westfield Hamburg “Überseequartier”

Located in Germany, the Westfield development is an integrated urban district spanning approximately 419,000 m² of gross floor area. The complex combines a retail area with more than 180 shops and restaurants, cinemas, hotels, offices, residential spaces and underground parking, alongside a metro station, cruise ship terminal and public transport facilities. Construction took place between 2023 and 2025.
Germany
Westfield
419.000 m²

Our scope

Altenova’s scope included VdS-compliant sprinkler and wall hydrant systems for the core buildings, covering approximately 200,000 m² and incorporating around 35,000 sprinkler heads. The project also involved water supply infrastructure serving three systems: wall hydrants, outdoor hydrants and sprinklers. In addition, Altenova delivered sprinkler installations for the fit-out of retail units for more than 40 tenants.

xyxy

Fire protection across a complex urban environment

The development brings together buildings and spaces with different functions, occupancy levels and operational requirements. Coordinating fire protection across the core buildings, shared infrastructure and individual retail units required an approach that accounted for these varying needs while meeting VdS requirements. The project combined large-scale sprinkler coverage with hydrant systems and tenant-specific installations across the wider development.

Westfield taxi terminal